Once the position is fixed, the work moves in a set order. How it runs depends on whether the kitchen roof is flat or pitched, and a rear extension in a village is often flat. The sequence below suits both with small changes.
The first point is protection. A kitchen is full of things you would not want covered in dust, so the room is cleared and sheeted before the ceiling is touched. Work starts outside, with the covering protected until the opening is formed and the unit is fixed.
The second is the upstand. On a flat roof, the unit sits on a raised insulated kerb, and the covering is taken up and over the kerb, so water runs clear of the join. On a pitched roof, the unit takes a flashing kit made for the roof covering. Both are standard jobs, but both are where leaks begin if the details are rushed.
Finally there is the ceiling. The light well inside is boarded, insulated and finished, and the reveals are painted or left ready for your decorator. A plain single unit in a Kegworth kitchen occupies the roof for a day or so, sometimes two, with the quote describing the access and finishing.
Tidiness matters in a working kitchen, and a good roofer leaves it as found. Floors are sheeted, doors are shut against dust, and the debris from the opening goes out through the roof, not through your hall. When the work is finished the room is cleared and swept before the team leaves.